1 |
T-20150417-2 |
Detailed Geotechnical Investigation and report for Nagpur Metro Rail System in Nagpur |
13/05/2015 |
ANANDJIWALA CONSULTANTS |
INR 78,00,000 |
2 |
T-20150417-1 |
“CONSTRUCTION OF BRIDGES (INCLUDING RAIL-OVER-BRIDGE OVER CONCOR SIDING AT KHAPRI), RETAINING WALLS, BOUNDARY WALLS AND EARTHWORK IN DEPOT AND AT-GRADE SECTION BETWEEN CH
14200 - CH. 21604.5 IN AIRPORT-KHAPARI-MIHAN DEPOT SECTION ON NORTH – SOUTH CORRIDOR OF NAGPUR METRO RAIL PROJECT"
|
30/05/2015 |
NCC LTD |
INR 85,98,53,253 |
3 |
T-20150606-2 |
Repairs And Renovation of Site Office at Khapri, Nagpur |
01/07/2015 |
M/S SWARAJ CONSTRUCTIONS |
INR 24,55,000 |
4 |
T-20150606-4 |
Providing and fixing chain link fencing & approach road to site office at Khapri |
04/07/2015 |
M/S SWARAJ CONSTRUCTION |
INR 14,63,000 |
5 |
T-20150606-3 |
Repairs and renovation of Korke Bunglow at Shivaji Nagar, Nagpur |
14/07/2015 |
M/S ATASHA ASHIRWAD BUILDERS |
INR 36,00,000 |
6 |
NMRCL/Admin/01/2015 |
Supply,installation,testing and commissioning of SIP based PABX system at NMRCL offices, at Metro House (Civil Lines), Udyog Bhavan and CPM office (st sonegoan, Wardha Road, Nagpur) and commissioning of interlinking of the PABX system at these locations |
24/08/2015 |
M/S GURUCOM COMMUNICATION PVT. LTD,401, INDIRA APARTMENT,PLOT NO.15/25 PANDEY LAYOUT, KHAMLA,NAGPUR-440020 |
|
7 |
NMRCL/U/S (ELE)/01-2015, DATED 22/07/2015 |
NMRCL/U/S (ELE)/03-2015,CH 11040 TO CH 16280:- Shifting & providing 315 KVA transformer substation HT & LT overhead line & cable through underground, 11 kv RMU, LBS from RR substation to Metro khapri station for Metro Rail Project on North South Corridor |
04/11/2015 |
YOGIRAJ POWERTECH |
INR 3,93,21,133.38 |
8 |
NMRCL/CIVIL (CONSUL) DDC-1/04/2015 |
Detailed Dsign Consultancy Services for 9 (nine) Stations on North-South Corridor of Nagpur Metro (5 elevated stations excluding viaduct in Station Portion, 2 elevated stations including viaduct in Station Portions and 2 No. at-grade sections |
17/11/2015 |
L&T INFRASTRUCTURE ENGINEERING LTD. & M/S RAJENDRAN ASSOSIATES |
INR 6,17,25,000 |
9 |
NMRCL/CIVIL(D & B)/02/2015 |
Design and construction of viaduct in reach-1 betweeen new airport and sitabuldi stations from 6790m-14400m including viaduct in five elevated station portions , on the north-south corridor of Nagpur Metro Rail Project |
28/11/2015 |
NCC LTD. |
INR 252,97,22,439 |
10 |
NMRCL/CIVIL(CONSUL)/07-2015 |
Selection of consulting services for “ conducting” Social Impact Assessment (SIA) study and preparation of Social Management Implementation Plan, Rehabilitation & Resettlement (RR Policy) Plan for Nagpur Metro Rail Project. |
11/12/2015 |
AFC INDIA LTD. & CENTRE FOR ENVIRONMENT RESEARCH & DEVELOPMENT |
INR 19,75,000 |
11 |
NMRCL/U/S (ELE)/02-2015,Dated 05/10/2015 |
Shifting of various Electrical utility for Nagpur Metro Rail Project from
CH- 8460 to CH- 10000 for N-S Corridor |
14/01/2016 |
M/S BADGUJAR & COMPANY |
INR 2,79,22,699.14 |
12 |
NMRCL/CONST (CIVIL)/04-2015,Dated 16/10/2015 |
Construction of
Residential, Office
Buildings and other
development works for
firing range at Wayfal for
Nagpur Metro Rail
Project |
25/01/2016 |
M/S SUPER CONSTRUCTION |
INR 9,64,84,638 |
13 |
NMRCL/CIVIL(CONSUL)/06-2015, Dated 09/09/2015 |
NMRCL invites bids through e-tender portal of NMRCL under electronic tendering system for selection of consulting services for "conducting" Environmental Impact Assessment (EIA) study and Environment Mitigation Plan for Nagpur Metro Rail Project |
27/01/2016 |
M/S ARVEE ASSOCIATES |
INR 36,69,300 |
14 |
NMRCL/U/S (WP)/02-2015,Dated 24/09/2015 |
Shifting of water supply
pipe lines of different
Diameters along Metro
alignment for priority
section from Munje Chowk
to MIHAN and other
locations |
27/01/2016 |
M/S M T PHAD |
INR 8,92,21,626 |
15 |
NMRCL/CIVIL(CONSUL)/05-2015 |
Electronic tendering system for selection of consultancy firm for 'Smart Card Ticketing' and 'Automated Fare Collection System' for Nagpur Metro extendable to other public transit systems in Nagpur city |
09/02/2016 |
M/S ERNST & YOUNG LLP |
INR 2,54,95,765 |
16 |
NMRCL/U/S (ELE)/04-2015 |
Shifting LT,HT O/H lines crossing and providing LT,HT U/G cables from
Hingna Depot CH. 19500 to Ambazari Lake CH.12500 for Nagpur Metro Rail
Project for E-W corridor. |
22/02/2016 |
M/S YOGIRAJ POWERTECH |
INR 5,64,24,058.21 |
17 |
NMRCL/CONSUL/ 3/2015 |
EXPRESSION OF
INTEREST (EOI)
FOR SELECTION,
SUPPLY,
INSTALLATION,
IMPLEMENTATIO
N OF AND
SUPPORT FOR
ERP AND 5D-BIM
SOLUTION AND
PROVIDE
SERVICES TO
SETUP AND
RAMP-UP
OWNERS
SUPPORT OFFICE |
24/05/2016 |
COSORTIUM M/S.AURIONPRO SOLUTIONS LTD., M/S.HIGHBAR,M/S.EXCELIZE |
INR 121,86,15,617 |
18 |
NMRCL/CIVIL(CONSUL.)/02-2015 |
Notice inviting Expression of Interest (EOI) for selection of GEneral Consultant (GC) for Nagpur Metro Rail Project |
10/06/2016 |
M/S. SYSTRA, M/S. AECOM , M/S.EGIS RAIL & M/S. RITES LTD. |
EURO 59,74,881 USD 6,93,00 INR 174,40,50,600 |
19 |
NMRCL/CIVIL (CONSUL)CADC- 1/04/2015 |
INTERNATIONAL
ARCHITECTURAL
DESIGN
COMPETITION
FOR THE
COMPREHENSIVE
ARCHITECTURAL
CUM DESIGN
CONSULTANCY
SERVICES FOR
THE PROPOSED
CONSTRUCTION
OF
1. INTER
CHANGE METRO
STATION AT
SITABURDI
INCLUDING
PROPERTY
DEVELOPMENT
ABOVE THE
STATION &
DEVELOPMENT
OF TTMC AREA
WITH
CONNECTIVITY
TO MUNJE
CHOWK, &
2. ZERO MILE
METRO STATION
INCLUDING
PROPERTY
DEVELOPMENT
ABOVE THE
STATION & ON
THE ADJOINING
LAND AREA. |
13/06/2016 |
M/S. ENIA ARICHETECHS FRANCE, M/S. MAHENDRA RAJ CONSULTANTS PVT.LTD |
INR 9,40,00,000 |
20 |
N1C-04/2016 Dated 02.03.2016 |
CONSTRUCTION OF SEVEN ELEVATED METRO STATIONS AND THREE AT GRADE STATIONS (NORTH SOUTH CORRIDOR) VIZ. CONGRESS NAGAR TO KHAPRI AND VIADUCTS BETWEEN CH:7/850 TO 8/030 AND CH:8/574 TO 9/692 IN REACH-1 |
21/07/2016 |
M/S. IL&FS ENGINEEING CONSTRUCTION COMPANY LTD. |
INR 532,67,12,628 |
21 |
NMRCL/U/S (ELE)/05 -2016,Dated 26/01/2016 |
Shifting of Various Electrical utility for
Nagpur Metro Rail Project form
CH- 6990 to Ch- 8420 for N-S Corridor |
23/07/2016 |
M/S RAMGOPAL SOMANI |
INR 4,54,63,056.94 |
22 |
N1-(U/S)/ (ELE)/06 & 07 - 2016, Dated 01/03/2016 |
Shifting of LT, HT O/H lines, crossings and providing LT, HT U/G cables from Ambazari Lake(CH.12500) excluding to LAD Square(CH.10800) for Nagpur Metro Rail Project for E-W Corridor |
25/07/2016 |
M/S BALAJI ASSOCIATES |
INR 2,47,40,353.04 |
23 |
N1Misc-C07(U/S)-2016, Dated 28/04/2016 |
Improvement & widening of Nagpur Hingna Road State Highway for construction E-W Metro corridor (Reach-3) from Hingna T Point to Lokmanya Nagar from CH. 14000 to 18300 (Length 4.3 Km) |
23/08/2016 |
M/S EAGLE INFRA 50% M/S WADHAVANI 50% |
INR 2,77,62,380 |
24 |
N1/IT-02 Date:31.03.2016 |
SELECTION OF AGENCY FOR COLLECTION OF DATA CENTER AND MANAGED SERVICES |
03/09/2016 |
M/S RELIANCE IDC LTD MUMBAI |
INR 4,94,89,232 |
25 |
N1Tr-02/2016 Dated 03.03.2016 |
DESIGN, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF 25 KV SINGLE PHASE, 50HZ AC, REGULATED, CONVENTIONAL AND TRAMWAY TYPE OHE IN ‘AT GRADE’ SECTION AND MIHAN DEPOT, 33/25 KV TRACTION SUB STATION & SSP INCLUDING 33 KV CABLING WORK OVER NORTH SOUTH CORRIDOR OF NAGPUR METRO RAIL CORPORATION LIMITED |
03/09/2016 |
M/S BRIGHT POWER PROJECTS INDIA PVT.LTD |
INR 27,15,59,355 |
26 |
N1HR-1/2016 Dated: 02.07.2016 |
PROVIDING MANPOWER FOR VARIOUS WORKS OF NMRCL ON OUT
SOURCE BASIS |
14/09/2016 |
M/S GREAT WALL CORPORATION SERVICES PRIVATE LIMITED. |
INR 1,12,78,496 |
27 |
N1C-07/2016 |
CONSTRUCTION OF 10 NO. ELEVATED METRO STATIONS EXCLUDING VIADUCT VIZ LOKMANYA
NAGAR, BANSI NAGAR, VASUDEV NAGAR, RACHANA(RING ROAD) JUNCTION, SUBHASH
NAGAR, DHARAMPETH COLLEGE, LAD SQ., SHANKAR NAGAR SQ., INSTITUTE OF ENGINEERS,
JHANSI RANI SQ. ON THE EAST-WEST CORRIDOR IN
REACH – 3 OF NAGPUR METRO RAIL PROJECT |
20/09/2016 |
M/S. ITD CEMENTATION INDIA LTD. |
INR 445,74,77,986 |
28 |
N1RS-1/2016 (ICB) Dt. 25/01/2016 |
DESIGN, MANUFACTURE, SUPPLY, TESTING, COMMISSIONING OF PASSENGER ROLLING STOCK (ELECTRICAL MULTIPLE UNITS) AND TRAINING OF PERSONNEL AT NAGPUR METRO RAIL PROJECT |
05/10/2016 |
M/.S CRRC CORPORATION LTD. |
USD 91,91,40,56.60 INR 103,26,69,186.95 |
29 |
N1-T04/2016 Dt. 17/06/2016 |
Supply of 2000 MT 90 UTS Rails, UIC 60, IRS-T-12-2009, 880 Grade for Nagpur Metro Rail Project. |
06/10/2016 |
M/S JINDAL STEEL & POWER LIMITED |
INR 11,78,56,250 |
30 |
N1C-11/2016 |
DESIGN AND CONSTRUCTION OF ELEVATED PART / SUPERSTRUCTURE OF 4 LANE NATIONAL HIGHWAY ROAD BRIDGE ON CONSTRUCTED METRO RAIL INTEGRATED PIER IN REACH-1 BETWEEN AJNI STATION AND AIRPORT STATION FROM CH 10253M TO 13663M ON NORTH SOUTH CORRIDOR OF NAGPUR METRO RAIL PROJECT (LIMITED TENDER) |
12/10/2016 |
M/S NCC LTD . |
INR 237,56,00,000 |
31 |
N1-(U/S)/ (ELE)/08- 2016, Dated 15/07/2016 |
Shifting of LT,HT O/H line ,crossings and providing LT,HT U/G cables from
Lad square (CH:10750) to Munje Chowk (CH:7743) for Nagpur Metro Rail Project for E-W Corridor. |
22/10/2016 |
M/S BADGUJAR AND COMPANY |
INR 1,37,71,175.37 |
32 |
N1C-08/2016 |
DESIGN AND CONSTRUCTION OF VIADUCT IN REACH-3 BETWEEN JHANSI RANI SQUARE TO LOKMANYA NAGAR STATIONS FROM CH 7825M TO 18212M ON THE EAST-WEST CORRIDOR OF NAGPUR METRO RAIL PROJECT. |
26/10/2016 |
M/S AFCONS INFRASTRUCTURE LTD |
INR 476,90,00,000 |
33 |
ICB-N1-T01/2016, DATED 06/03/2016 |
SUPPLY OF 10000 MT 60E1 (UIC 60), 1080 GRADE HEAD HARDENED (HH) RAILS AS PER IRS T-12, 2009 FOR NAGPUR METRO RAIL PROJECT |
28/10/2016 |
M/S.EAST METAL AG |
USD 84,10,000 |
34 |
ICB -N1-T02/2016 |
Design, Manufacturing & Supply of Standard Gauge 60E 1 (UIC 60) Turnouts
for Nagpur Metro Rail Projects. |
02/11/2016 |
CONSORTIUM OF M/S. VOSSLOH COGIFER FRANCE |
EURO 15730 INR 28,33,05,379 |
35 |
N1-T06/2016 Dt. 04/07/2016 |
SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF BALLASTED TRACK IN AT GRADE SECTION OF NORTH-SOUTH CORRIDOR ALONG WITH BALLASTED/ EMBEDDED TRACK IN MIHAN & HINGNA DEPOTS OF NAGPUR METRO RAIL PROJECT. |
02/11/2016 |
M/S. RAHEE INFRA STRUCTURE |
INR 43,94,00,182 |
36 |
N1C-05/2016 |
Construction of METRO Train Depot at MIHAN (North-South Corridor) & HINGNA (East-West Corridor) including Civil & E&M Works for Nagpur Metro Rail Corporation Limited |
30/11/2016 |
CONSORTIUM M/S. PRATIBA CSL- M/S.SUDHIR CONSTRUCTION |
INR 275,66,41,944 |
37 |
N1D-11/2016 |
LIMITED TENDER FOR SELECTION OF ARCHITECT FOR DETAIL PLANNING & DESIGNING OF PROPERTY DEVELOPMENT AT MIHAN DEPOT LAND FOR NAGPUR METRO RAIL CORPORATION LTD |
08/12/2016 |
M/S. ARCHITECT HAFEEZ CONTRACTOR |
INR 5,36,00,000 |
38 |
N1EG-04/2016 Dt. 30.05.2016 |
Design, Engineering, Manufacture, Supply, Storage Civil work, Erection, Testing & Commissioning of the Rooftop Solar PV project including Operation and Comprehensive Maintenance (O&M) of the project in RESCO Model for a period of 25 years after commissioning of projects in METRO BHAWAN of NMRCL (Corporate Office Building Of NMRCL) |
09/12/2016 |
M/S. OPTION SALES PVT LTD,M/SWELSPUN ENERGY PVT LTD & M/S HYGRID SOLAR PVT LTD. |
|
39 |
N1-(U/S)/ (ELE)/09-2016, DATED 01/09/2016 |
Shifting of LT, HT, O/H Lines, Crossings and Providing LT, HTU/G Cables From Prajapati Nagar (CH:00.00) To Telephone Exchange Square (CH:3075) for Nagpur Rail Project of E-W Corridor. |
28/12/2016 |
M/S BALAJI ASSOCIATES. |
INR 3,92,75,201.38 |
40 |
N1ADM-1/2016 Dated: 07.09.2016 |
Providing Security Services For NMRCL Offices, Guest Houses & Sites / Site Offices On Out Source Basis |
28/12/2016 |
M/S GREAT WALL CORPORATE SERVICES PVT LTD. |
INR 52,75,440 |
41 |
N1C-13/2016 (NCB) Dt. 13.10.2016 |
Construction of NHAI Flyover originating from Ujjawal Nagar on the North-South corridor of Nagpur Metro Rail Project to Manish Nagar in Nagpur |
28/12/2016 |
M/S NCC LTD . |
INR 91,83,28,907 |
42 |
N1-(U/S)/(ELE)/10-2016 DATED 07/09/2016 |
SHIFTING OF LT, HT,O/H LINE, CROSSING AND PROVIDING LT, HT, U/G CABLE FROM TELEPHONE EXCHANGE SQUARE(CH:3075) TO MAYO HOSPITAL (CH:5800) FOR NAGPUR METRO RAIL PROJECT FOR E-W CORRIDOR |
03/01/2017 |
M/S BADGUJAR & CO . |
INR 3,45,71,572.58 |
43 |
N1S-01/2016. (ICB) Date:16/07/2016 |
DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF SIGNALLING AND TRAIN CONTROL SYSTEM FOR NAGPUR METRO RAIL PROJECT. |
18/01/2017 |
M/S. SIEMENS ROLL AUTOMATION, S.A.U(CONSORTIUM OF SIEMENS LTD & SIEMENS ROLL AUTOMATION) |
EURO 6,81,436.63 INR 12,92,96,063.87 |
44 |
N1-(U/S)/ (ELE)/12-2016, Dated 22/09/2016. |
Shifting of LT, HT, O/H line, Crossing and providing LT, HT, U/G cable from NMC RUB (CH:7250) to Munje Chowk (CH:7743) for Nagpur Metro Rail Project of E-W Corridor. |
25/01/2017 |
M/S BADGUJAR AND COMPANY |
INR 2,95,00,843.66 |
45 |
N1-(U/S)/ (ELE)/11- 2016, Dated 15/09/2016 |
SHIFTING OF LT, HT, O/H LINE, CROSSING AND PROVIDING LT, HT, U/G CABLE FROM MAYO HOSPITAL (CH:5800) TO NMC RUB (CH:7250) FOR NAGPUR METRO RAIL PROJECT OF E-W CORRIDOR |
25/01/2017 |
M/S BADGUJAR AND COMPANY |
INR 2,77,57,993.95 |
46 |
ICB -N1-T03/2016 Dt. 23/03/2016 |
Supply of Fastening System for ballastless track for North-South Corridor and East-West Corridor
Including Connectivity to Depot of Nagpur Metro Rail Projects |
14/02/2017 |
M/S PENDROL-PRT CONSORTIUM |
USD 28,33,653.88 INR 46,38,68,485.38 |
47 |
N1 MISC-09/2016, DATED 19/11/2016 |
MAINTENANCE OF LANDSCAPING, GARDENS, LAWNS AND PLANTATION AT DIFFERENT PLACES OF NMRCL |
27/02/2017 |
M/S ARUN CONSTRUCTION |
INR 30,62,452 |
48 |
N1D-06/2016 Dated : 04/08/2016 |
SELECTION OF CONSULTANT FOR BRANDING AND CUSTOMER EXPERIENCE MANAGEMENT FOR NAGPUR METRO RAIL CORPORATION LIMITED |
08/04/2017 |
M/S. TATA ELEXI |
INR 3,53,00,000 |
49 |
N1Tr-01/2016 (ICB) |
DESIGN, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF RECEIVING CUM AUXILIARY MAIN CUM TRACTION SUB STATIONS INCLUDING HIGH VOLTAGE CABLING FROM GRID SUBSTATION, 33KV CABLE NETWORK, ASS & SCADA SYSTEM FOR NAGPUR METRO RAIL PROJECT |
08/04/2017 |
M/S. STERLING AND WILSON PVT.LTD, & M/S. COBRA INSTALACIONSY SA |
INR 250,05,31,196 |
50 |
N1TL-02/2016 DATED:14.8.2016 |
Implementation of EMV Based open loop Automated Fare Collection System for Nagpur Metro Rail Project, extendable to NMC managed city buses and parking services. |
12/04/2017 |
M/S STATE BANK OF INDIA(CONSORTIUM OF M/S STATE BANK OF INDIA,M/S S.C. SOFT PTE LTD. AND M/S AURIONPRO SOLUTIONS LTD.) |
|
51 |
N1IT-03/2016 DATED.19.11.2016 |
SUPPLY DESIGN & COMMISSIONING OF IT NETWORK, IT INFRASTRUCTURE AND PROVISION OF FACILITY MANAGEMENT SERVICES |
25/04/2017 |
M/S. AURIONPRO SOLUTIONS LTD, M/S.TECHNICHE CONSULTING SEVERCIES PVT.LTD.AND M/S. MULTITECH SOLUTIONS PVT.LTD. |
INR 10,39,49,599 |
52 |
N1TL-01/2016 (ICB) DATED 12.08.2016 |
DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF TELECOMMUNICATION SYSTEM FOR NAGPUR METRO RAIL PROJECT |
09/05/2017 |
M/S. L&T SMART WORLD COMMUNICATION BU |
INR 1,23,07,01,768 USD 87,23,929 |
53 |
N1EG-05/2016 (ICB) Dt. 20.09.2016 |
DESIGN, MANUFACTURING, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF HEAVY DUTY MACHINE ROOM LESS ELEVATORS & ESCALATOR FOR NMRCL PROJECT |
15/05/2017 |
M/S. SCHINDLER INDIA PVT LTD |
INR 105,93,44,903; USD 14,592,939 |
54 |
N1-(U/S)/(ELE)/14-2017, Dated 06.04.2017 |
Shifting of 132KV Double circuit tower Loc.No. 54 & 55 of 132KV AmbazariPardi & Hingna-II Khapri Transmission line for raising of height due to Metro Rail Track Alignment in Mihan Depot and Khapri |
18/05/2017 |
M/S. NEHA CONSTRUCTION, NAGPUR. |
INR 71,70,027.5 |
55 |
N1HR-03/2017 Dated: 26.02.2017 |
Appointment of Agency For Recruitment of Staff in Maharashtra Metro Rail |
31/05/2017 |
M/S TATA CONSULTANCY SERVICES |
INR 3,72,00,000 |
56 |
N1TR-03/2016 (ICB) DT. 21.06.2016 |
DESIGN, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF 25 KV FLEXIBLE OHE AND SECTIONING POSTS FOR NAGPUR METRO RAIL PROJECT |
31/05/2017 |
M/S SIEMENS INDIA PVT LTD |
INR 77,20,49,302.34 USD 1,039,032.72 EURO 2,972,331.48 |
57 |
N1M&P-1/2016. (ICB) |
DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING, COMMISSIONING OF MACHINERY AND PLANT FOR 02(TWO) NUMBERS OF ROLLING STOCK DEPOTS AT MIHAN AND HINGNA OF NAGPUR METRO RAIL PROJECT AND TRAINING OF PERSONNEL |
03/08/2017 |
M/S SIEMENS INDIA PVT LTD |
EURO 1,01,21,559; USD 31,82,532; INR 41,12,81,915 |
58 |
N1C-09/2016(ICB) Dt. 22/11/2016 |
DESIGN AND CONSTRUCTION OF ELEVATED VIADUCT OF LENGTH 6.836 KMS FROM CH: 590 TO CH: 5809, CH: 6000 TO CH: 7100 AND CH: 7183 TO CH: 7700 BETWEEN PRAJAPATI NAGAR TO SITABULDI. AND ROR NEAR ANAND TALKIES, VIADUCT & RAMP NEAR RAMJHULA , ROR NEAR PRAJAPATI NAGAR AND VIADUCT OF LENGTH 1.050 KMS FROM CH(-)496 TO CH:90.962 AND CH:126.962 TO CH:590 ON BOQ BASIS.(REACH-4) |
17/08/2017 |
M/S ITD CEMENTATION INDIA LIMITED |
INR 372,17,31,200 |
59 |
N1C-06 /2016 (ICB) Dt 03.01.2017 |
CONSTRUCTION OF EIGHT NUMBER OF ELEVATED METRO STATIONS VIZ PRAJAPATI NAGAR , VAISHNO DEVI SQUARE , AMBEDKAR SQUARE , TELEPHNE EXCHANGE. CHITIAR Oll SQUARE, AGRASEN SQUARE, DOSAR VAISYA SQUARE & NAGPUR RAILWAY STATION ON THE EAST-WEST CORRIDOR (REACH-4) OF NAGPUR METRPO RAil PROJECT |
17/08/2017 |
ITD CEMENTATION INDIA LTD. |
INR 310,30,88,850 |
60 |
N1PD-02/2017 DT. 11.04.2017 |
DEVELOPMENT AND OPERATION OF PART OF LAND DEMARCATED FOR PROPERTY DEVELOPMENT AT KHAPRI STATION OF NAGPUR METRO RAIL PROJECT ON PUBLIC PRIVATE PARTNERSHIP (DBFOT) BASIS |
30/08/2017 |
M/S. SILVER LINE TECHNOLOGIES & GALAXY INFRASTRUCTURE |
|
61 |
N1-(U/S)/ELE/15-2017 DATED 25/05/2017 |
SHIFTING OF LT, HT, O/H LINE, CROSSING AND PROVIDING LT, HT, U/G CABLE FROM MUNJE CHOWK (CH:6675) TO ROB(CH:4000 NGP.ET) FOR NAGPUR METRO RAIL PROJECT OF N-S CORRIDOR |
21/09/2017 |
M/S. ETC-ENERGY THERAPY CO. PVT. LTD |
INR 3,10,11,800 |
62 |
N1-(U/S)/ (ELE)/17-2017 DATED 25/05/2017 |
SHIFTING OF LT, HT, O/H LINE CROSSING AND PROVIDING LT, HT, U/G CABLE FROM CHAUKS COLONY (CH:1750) TO TEKANAKA (CH:1175) FOR NAGPUR METRO RAIL PROJECT OF N-S CORRIDOR |
21/09/2017 |
M/S.ETC-ENERGY THERAPY CO. PVT. LTD |
INR 5,47,58,527.32 |
63 |
N1-(U/S)/(ELE)/19-2017 Dated 26/07/2017 |
Shifting of LT, HT, O/H, lines, crossings and providing LT,HT, U/G cables.Supplying & Erection of LED Street Light poles (Hexagonal) from Manish Nagar (Reliance Fresh) to Ujwal Nagar Wardha Road, for Over Bridge/RUB, Nagpur Metro Rail Project. |
27/09/2017 |
M/S. J.K.SOLUTIONS PVT. LTD. |
INR 1,20,57,850.43 |
64 |
ICB N1- T05/2016 dt 06/11/2016 |
Supply, installation, testing and commissioning of Ballastless track of Standard Gauge North-South Corridor of Line-1 ( Sitaburdi - Khapri ) and East - West Corridor of Line-2 ( Sitaburdi - Lokmanya Nagar) sections of Nagpur Metro Rail Corporation Limited |
03/10/2017 |
M/S. RAHEE –EMRAIL JV |
INR 83,33,30,340 |
65 |
N1-(U/S)/ (ELE)/16-2017 DATED 25/05/2017 |
SHIFTING OF LT, HT, O/H LINE CROSSING AND PROVIDING LT, HT, U/G CABLE FROM KAMGAR NAGAR (CH:0500) TO AUTOMOTIVE SQUARE (CH:0300) FOR NAGPUR METRO RAIL PROJECT OF N-S CORRIDOR |
10/10/2017 |
M/S. BADGUJAR AND COMPANY |
INR 5,61,63,276.32 |
66 |
N1-(U/S)/(ELE)/18/2017, Dated 21/07/2017 |
Electrical utility shifting LT,HT,O/H Lines crossing and providing LT,HT,U/G cable for Lokmanya Nagar, Rachana T-Point & Subhash Nagar, Nagpur Metro Rail Project for E-W corridor |
11/10/2017 |
M/S. BADGUJAR AND COMPANY |
INR 95,29,053.01 |
67 |
N1EG-08/2017 (NCB) Dt. 17.07.2017 |
Supply, Installation,Testing and Commissioning of Water & Air Cooled Chillers along with associated accessories. Air Distribution system, Mechanical Ventilation System, Geo-thermal System for Metro Bhawan for Nagpur Metro Rail Project. |
13/10/2017 |
M/S. GENTECH ENGINEERING SERVICE |
INR 11,85,40,054.02 |
68 |
N1C-12/2016(ICB) DT. 13/04/2017 |
DESIGN AND CONSTRUCTION OF ELEVATED VIADUCT OF LENGTH 2.769 KM FROM CH:3620.950 TO CH:3962.558,4042.558 TO 5988.303 AND 6131.017 TO 6612.560 BETWEEN GADDIGODAM TO SITABULDI (EXCLUDING ZERO MILE STATION ) AND RAILWAY SPAN NEAR GADDIGODAM, VIADUCT AND ROAD CUM RAIL FLYOVER (DOUBLE DECKER) OF LENGTH 4.375KM INCLUDING APPROACH RAMPS FROM CH:673.910 TO 3620.950 AND 3962.558 TO 4042.558 ON BOQ BASIS (REACH 2) |
16/10/2017 |
M/S. AFCONS INFRASTRUCTURE PVT. LTD. |
INR 603,29,91,513 |
69 |
N1ADM-03/2017 Dated: 11.08.2017 |
HIRING OF VEHICLES (TAXIES) FOR OFFICIALS OF MAHARASHTRA METRO RAIL CORPORATION LIMITED (NAGPUR METRO RAIL PROJECT) - (SECOND CALL) |
09/11/2017 |
M/S.RIYA SERVICES (50%)+(25%) M/S.ASHOK TRAVELS (15%) M/S.CHANDRADEEP TRAVELS (10%) |
INR 1,93,62,072 |
70 |
N1-(U/S)/ (ELE)/22, 2017,Dated 12/08/2017 |
SHIFTING OF LT, HT, O/H LINE CROSSING AND PROVIDING LT, HT , U/G CABLE TRANSFORMERS RMU'S CABLES FROM INDORA CHOWK (CH:2275) TO RAILWAY ROB (CH:4000) FOR NAGPUR METRO RAIL PROJECT ON N-S CORRIDOR REACH-2 |
09/11/2017 |
M/S. ADINATH INCORPORATION |
INR 3,70,05,463.11 |
71 |
N1-(U/S)/ (ELE)/21, 2017,Dated 12/08/2017 |
Shifting of LT, HT, O/H line, Crossing and providing LT, HT, U/G cable Transformers, RMU’s, Cables from Chouks Colony (CH.1750) To Indora Chowk (CH.2275) for Nagpur Metro Rail Project on N-S Corridor Reach-2. |
14/11/2017 |
M/S. S.T.ELECTRICALS PVT.LTD. |
INR 5,49,50,381.77 |
72 |
N1-(U/S)/ (ELE)/20, 2017,Dated 12/08/2017 |
Shifting of LT, HT, O/H line, Crossing and providing LT, HT, U/G cable Transformers, RMU’s, Cables from Kamgar Nagar (CH.0500) To Teka Naka (CH.1175) for Nagpur Metro Rail Project on N-S Corridor Reach-2. |
20/11/2017 |
M/S. S.T.ELECTRICALS PVT.LTD. |
INR 4,78,42,708.71 |
73 |
ICB -N1-T07A/2017 Dt.03/06/2017 |
Supply , Installation, Testing and Commissioning of one ) 16 Split Head B tamping
machine for tamping of ballasted track laid on main line and in the two maintenance depots. (Second Call) |
05/12/2017 |
M/S. PLASSER INDIA PVT.LTD. |
INR 8,97,55,553 |
74 |
N1ADM-2/2017 Dated: 23.08.2017 |
Providing Services of Quick Response Team (QRT) cum Rescue Team for MAHA- METRO (Nagpur Metro Rail Project) for a period of Two Years on Out Source Basis |
08/01/2018 |
M/S.GREAT WALL CORPORATION SERVICES PVT.LTD. |
INR 84 13,430 |
75 |
N1-Misc-(C)09/2017, Dated 28/11/2017 |
Shifting and relaying of existing sewer lines infringing with Metro Corridor within NMC Limit. |
08/01/2018 |
M/S.S.P.CONSTRUCTION |
INR 49,99,414 |
76 |
N1-(U/S)/(C)-23/2017, Dated 20/12/2017 |
Construction of four lane road
from TCI warehouse to Khapri
Station, providing RCC drain,
canvas concreting at grade
section within metro corridor
near MIHAN ROB |
27/02/2018 |
M/S .VENUS BUILDTECH INDIA PVT.LTD. |
INR 3,26,18,423.01 |
77 |
N1-M&P-7/2017 |
DESIGN , MANUFACTURE, SUPPLY, INSTALLATION, TESTING, COMMISSIONING OF 4 WHEELER CATENARY MAINTENANCE, VEHICLE CATENARY MAINTENANCE NAGPUR METRO RAIL PROJECT AND TRAINING OF PERSONNEL. |
05/03/2018 |
M/S.PHOOLTAS TRANSRAIL LTD. |
INR 1,98,51,012.50 |
78 |
N1-M&P-08/2017 |
DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING, COMMISSIONING OF RAIL CUM ROAD VEHICLE FOR NAGPUR METRO RAIL PROJECT AND TRAINING OF THE PERSONNEL |
15/03/2018 |
M/S.PHOOLTAS TRANSRAIL LTD. |
INR 45,75,037.5 |
79 |
N1ADM-04/2017 DATED : 7.12.2017 |
PROVIDING SERVICES OF HOUSEKEEPING & CLEANING TICKETING (TOM/EFO MANAGEMENT), CUSTOMER FACILITATION, SECURITY AND MAINTENANCE REQUIRED AT THREE STATIONS AND MIHAN DEPOT OF MAHA-METRO (NAGPUR METRO RAIL PROJECT) FOR A PERIOD OF ONE YEAR (AND EXTENDABLE BY ONE YEAR ON PERFORMANCE BASIS) ON OUTSOURCE BASIS |
17/04/2018 |
M/S.GREAT WALL CORPORATION SERVICES PVT.LTD. |
INR 6,18,55,257 |
80 |
N1 MISC -16/2018 DATED : 10/04/2018 |
ANNUAL MAINTENANCE OF 5000 TRESS AT LITTLE WOOD PLANTATION AT AMBAZARI FOR the YEAR 2018-2019 |
24/05/2018 |
A.M.CHOUDHARI |
INR 24,01,454.49 |
81 |
N1-Misc-20/2018 Dated: 26.05.2018 |
Maintenace of Garden & Horticulture works at Civil lines opposite Metro House, Metro Mansion, CPM Office & NMRCL Guest House & Lawns at Ambazari (2018-2019). |
05/07/2018 |
A.M.CHOUDHARI |
INR 44,71,269 |
82 |
N1-Misc-21/2018 Dated: 04.06.2018 |
Plantation of 6000 trees (plants) in Ambazari Catchment area (block no.24, 25, 26) in compartment no 797 of Hingna forest range for Year - 2018 with maintenance period of
six months |
05/07/2018 |
PIYUSH D KALE |
INR 62,22,245.4 |
83 |
N1T-09/2018 Dt. 25/01/2018 |
Supply, Installation, Testing and Commissioning of Ballastless Track of Standard Gauge Phase-1,North-South Corridor of Reach-2 (Sitaburdi – Automotive Square) and East-West Corridor of Reach-4 (Sitaburdi to Prajapati Nagar) Sections of elevated Ballastless Track of Nagpur Metro Rail Project. |
13/08/2018 |
TEXMACO RAIL ENGINEERING LTD AND RAHEE INFRATECH LTD. |
INR 70,78,95,000 |
84 |
N1-M&P-10/2018 Dated: 25.04.2018 |
Design, Manufacture, Supply, Installation, Testing, and Commissioning of Wheel Profile Meter for Nagpur Metro Rail Project and Training of the Personnel. |
26/09/2018 |
APNA TECHNOLOGIES & SOLUTIONS |
INR 35,51,015 |
85 |
N1-(U/S)/ (ELE)/24-2018, Dated 23/07/2018 |
Providing temporary electric connection at Subash Nagar, Vasudev Nagar, Bansi Nagar and Lokmanya Nagar Metro Stations under R-III corridor. |
27/09/2018 |
M/S. SNEHAL ELECTRICAL APPLIANCES |
INR 57,01,046 |
86 |
N1-Misc-19/2018 Dated: 20.05.2018 |
Supply and Installation works (including Fabrication) of Signage and Graphics including aII transportation, Loading and unloading etc., for 7 Metro Stations viz. Airport, Ujjwal Nagar, Jai Prakash Nagar, Chhatrapati Sq., Ajni Sq., Rahate Colony and Congress Nagar for Nagpur Metro Rail Project |
16/11/2018 |
M/S.SATIN NEO DIMENSION PVT.LTD |
INR 3,00,16,991 |
87 |
N1-EG-14/2018 Dt.27.09.2018 |
Open Tender for “Supply, Installation, Testing and Commissioning of Fans 1500mm (52inch) diameter, operating on AC power 230v 1phase 50Hz supply, 200sqft area coverage with 7353 CFM for Stations of Nagpur Metro Rail Project. |
26/11/2018 |
M/S SANBROS SPARES PVT LTD |
INR 16,50,096 |
88 |
N1-M&P-11/2018 Dated: 20.05.2018 |
Design, Manufacture, Supply, Installation, Testing, Commissioning of Wheelset Towing Trolley for Nagpur Metro Rail Project and Training of the Personnel |
06/12/2018 |
M/S.BEMCO HYDRAULIC LIMITED |
INR 14,75,000 |
89 |
N1ADM-05/2018 Dated : 26.10.2018 |
HIRING OF VEHICLES (TAXIES) FOR OFFICIALS OF MAHARASHTRA METRO RAIL CORPORATION LIMITED (NAGPUR METRO RAIL PROJECT) |
27/12/2018 |
1.M/S.CHANDRADEEP TRAVELS.50% 2.M/S.MANISHA TRAVELS 30% 3.M/S.ASHOK TRAVELS 20% |
1. INR 1,12,60,200 2. INR 67,56,120 3. INR 45,04,080 |
90 |
N1-MISC-CRF-01-R1/19 Date: 10.01.2019 |
Improvement of Traffic Congestion at Futala Lake Road & Construction of concrete road with Viewing Gallery in Nagpur. |
27/02/2019 |
M/S. D. P. JAIN & CO. INFRASTRUCTURE PVT. LTD |
|
91 |
N1PD-09/2019 Dt. : 07/01/2019 |
Licensing of Property Business Spaces having area less than 100 Sqm at Khapri Metro Station, Airport Metro Station and Jaiprakash Nagar Metro Station of Nagpur Metro Rail Project for a period of 09 Years. |
08/03/2019 |
M/S. MOTHERS DAIRY FRUITS & VEGETABLE PVT. LTD |
|